Offshore wind
Decommissioning
Oil & gas
Available to rent
The subsea mooring connector with a 100% failure-free track record.
30,000
kN
Current design MBL
300+
Connectors in service
100%
Failure-free track record
52
years
Longest design life
No limit
Water depth
How it works
01
02
03
Watch the operating sequence
Specifications
Minimum breaking load
No limit; current design up to 30,000 kN (6,744 kips)
Water depth
No depth limit
Design life
Up to 52 years
Classification
ABS, DNV, BV and Lloyd’s Register
Connection
Compact, for rapid subsea installation; fail-safe at zero load or inversion
Interfaces
Direct to chain, LTM shackles, H-links, Y-links, sockets and other mooring jewellery
Anchors
Suction and driven piles, gravity bases, drag embedment, SEPLA and torpedo anchors
Material
Load-bearing parts machined from forged ASTM A182 F22 (mod) steel, to Balltec’s own specification
Moored units
FPSOs, FSOs, drill ships, TLPs, spars, buoys, semi-submersibles, floating wind and tidal devices
Mooring specialist
Replies within 48 hours
Downloads
Datasheet
General arrangement drawing
STEP · on request
On request
Range
Mooring connector, customisable to project-specific interfaces
Current design up to 30,000 kN MBL
Self-aligning connector for H-link mooring systems
Simple pinned connection, any depth
Release-under-load connector for temporary moorings, triggered acoustically
8,414 kN MBL as standard
In the field
Available to rent
Technicians and certification included, for one campaign or many.
Tell us the load, the interface and the deadline, and an engineer will come back to you within 48 hours.
Some cookies keep this site working. With your permission, we’d also like to use cookies to understand how the site is used, and to show maps and videos from other sites.
Fill in the following details and click the Submit button.
You will hear from us within three working days.