Offshore wind

Decommissioning

Oil & gas

Available to rent

In development

TLP Connector

A tension leg platform connector for the floating wind market.

A new design, demonstrated at our Morecambe site in 2024, building on decades of subsea mooring experience with MoorLOKâ„¢. Tell us about your floating wind project.

How it works

Ball-and-taper connector in cross-section: stab in, lock under load, release (illustrative)LoadTapered mandrelHardened steel ballsGrip grows with loadBall cagePile or pipe wall01 Stab in02 Lock under load03 Release at zero load03 Lift clear
As the load comes on, each ball rolls up its taper and wedges against the wall. More load means more grip.

01

Stab in

The tool slides into the receptacle, pile or pipe. The balls sit free in their cage.

02

Lock under load

As the lift starts, each ball rolls up its taper and wedges against the wall. More load means more grip.

03

Release at zero load

With the load off, the cage lifts the balls clear. Remote release, no divers.

Watch the operating sequence

Specifications

Technical data

Application

Tension leg platforms for floating offshore wind

Status

In development

Based on

MoorLOKâ„¢ subsea mooring connector experience

Floating wind specialist

Replies within 48 hours

Tell us about your floating wind concept, and we’ll share what the TLP Connector can do as the design develops.

Downloads

STEP · on request

On request

Range

The TLP Connector family

In the field

TLP Connector on recent projects

Offshore wind

Decommissioning

Oil & gas

TBA

Gulf of Thailand

Guará-Lula FPSO Mooring Connectors and Tensioners in Workshop

Offshore wind

Decommissioning

Oil & gas

TBA

Guará-Lula, Brazil

Offshore wind

Decommissioning

Oil & gas

TBA

Vineyard Wind 1

Offshore wind

Decommissioning

Oil & gas

TBA

Dogger Bank

Offshore wind

Decommissioning

Oil & gas

3,000 mT SWL

Borkum Riffgrund 3 and Gode Wind 3

Hollandse Kust Zuid (HKZ) 1-4 Wind Farm Project 2200 MT, LiftLOK Quick Connector​ Quick connect / release tool 2200 mT SWL

Offshore wind

Decommissioning

Oil & gas

2,200 mT SWL

Hollandse Kust Zuid 1–4

Offshore wind

Decommissioning

Oil & gas

26,952 kN MBL

Catenary mooring, Mad Dog field

LiftLOK, ballgrab, ball and groove, 3000 mT, high load, Quick release disconnect, remote connector, Moray West

Offshore wind

Decommissioning

Oil & gas

3,000

Moray West Offshore Wind Farm

LiftLOK, 3000 mT, connector, decommissioning, Allseas Pioneering Spirit, oil platform jackets

Offshore wind

Decommissioning

Oil & gas

3,000

mT ILTs

North Sea platform decommissioning

Allseas

North Sea

LiftLOKâ„¢ ILT

Available to rent

TLP Connector from UK stock in 48 hours

Technicians and certification included, for one campaign or many.

Let’s engineer your next project together.

Tell us the load, the interface and the deadline, and an engineer will come back to you within 48 hours.

24/7 operational support

Engineers and technicians on call, 365 days a year.

Application form

Fill in the following details and click the Submit button.

You will hear from us within three working days.