Offshore wind
Decommissioning
Oil & gas
Available to rent
Tried and tested coiled tubing handling tools for tough environments.
0.5″–4.5″
Coiled tubing sizes
Compact
Light enough to handle by hand
High-load
Ball-and-taper grip
48
hr
Mobilisation from UK stock
How it works
01
02
03
Watch the operating sequence
Specifications
Tubing size
0.5″–4.5″
Design
Compact and high-load; light enough to handle by hand
Connection
Mechanical, ball-and-taper
Uses
Coiled tubing handling, downhole and oilfield work
Related tools
Fishing tools, QED for BHA, emergency subsea casing string hang-off and drill pipe slips
Rental
From UK stock, 48 hr mobilisation
Oilfield specialist
Replies within 48 hours
Downloads
Datasheet
General arrangement drawing
STEP · on request
On request
Range
Coiled tubing handling tool
0.5″–4.5″
Emergency disconnect for bottom hole assemblies (BHA)
Down-hole fishing tools, drill pipe slips and drill string handling tools
In the field
Available to rent
Technicians and certification included, for one campaign or many.
Tell us the load, the interface and the deadline, and an engineer will come back to you within 48 hours.
Some cookies keep this site working. With your permission, we’d also like to use cookies to understand how the site is used, and to show maps and videos from other sites.
Fill in the following details and click the Submit button.
You will hear from us within three working days.